Книга Critical Path Analysis in Practice: Collected papers on project control

Код товару: 20207983

Книга Critical Path Analysis in Practice: Collected papers on project control

Код товару: 20207983
Формат
Мова книги
Видавництво
Рік видання
Опис книги

Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences.
This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press.
Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.

Характеристики
Видавництво
Кількість сторінок
166
Рік видання
2001
Доставка
Вказати місто доставки Щоб бачити точні умови доставки
Варіанти оплати
Оплата карткою онлайн (через сервіс LiqPay)
Передплата за рахунком
Відгуки
17294 грн